Concrete Slab Planner

Updated How we calculate5 sources

At the default settings, a 12 × 10 ft patio comes to 74 bags of 80 lb concrete, 2.3 tons of base gravel, 11 sticks of rebar, 4 form boards and 19 stakes. Change the size, base, reinforcement or forms and the shopping list follows.

1. Slab size
L-shape or odd shape? Add sections
2. Gravel base
Set to 0 to skip.
Raise this to 25% if you'll compact the base (Quikrete: 5 in loose packs to 4).
3. Reinforcement
From your plans or local code. Sticks are 20 ft, edges 3 in.
4. Forms
Enter it for L-shapes.
Add your prices for a cost total (optional)
Use the prices you're quoted. Nothing is sent anywhere.
Shopping list
ItemQuantityCost

Quick answers

How the planner works

Concrete is area × thickness plus your extra. It's shown two ways, cubic yards for ready-mix and 80 lb bags at about 0.60 cubic feet each (Quikrete data sheet). You buy one or the other, not both.

The gravel base uses the same area × the base depth, plus the extra you set. It's shown in cubic yards and in tons at 105 lb per cubic foot (Engineering ToolBox, dry gravel).

Rebar is laid out as a grid at your spacing, 3 in in from the edges and cut from 20 ft sticks. Runs longer than one stick get a lap, meaning the bars overlap by the lap length. Weight comes from the bar's weight per foot. Wire mesh is counted in sheets, with the overlap you enter.

Form boards cover each side of the rectangle. Stakes go at your spacing, plus one at each corner. For an L-shape, enter the real perimeter.

Worked example: the default 12 × 10 ft patio

The slab is 12 × 10 = 120 sq ft. At 4 in thick that's 120 × 4 ÷ 12 = 40 cubic feet, and 10% extra makes 44 cubic feet, or 1.63 cubic yards. In bags, 44 ÷ 0.60 = 73.3, so buy 74 bags of 80 lb.

The 4 in gravel base is also 40 cubic feet, 44 with the default 10% extra, which is 4,620 lb, about 2.3 tons at 105 lb per cubic foot. If you'll compact it, set the extra to 25% the way Quikrete does (5 in loose packs to 4): 50 cubic feet, about 2.6 tons.

#4 rebar on an 18 in grid, 3 in in from the edges, needs 7 bars 11.5 ft long and 8 bars 9.5 ft long. One 20 ft stick gives one 11.5 ft bar or two 9.5 ft bars, so that's 7 + 4 = 11 sticks, about 157 ft and 105 lb of steel.

The edge is 2 × (12 + 10) = 44 ft. With 12 ft boards, that's 4 boards, one per side. A stake every 3 ft is 44 ÷ 3 = 14.7, rounded up to 15, plus 4 corners: 19 stakes.

Only need one part? Use the concrete calculator, the gravel calculator or the rebar calculator.

Common questions

How thick should the gravel base be?

The planner starts at 4 inches. Change it if your local code or supplier says otherwise. Compact the base in layers, and enter the depth after compaction.

Do I need rebar in a patio slab?

Your plans or your local building department decide that. The planner can count rebar, wire mesh or neither, so set it to match what they call for.

How do I plan an L-shaped patio?

Split it into rectangles and add them as sections. For the forms, enter the real perimeter of the whole shape, because two rectangles share an edge that doesn't need forms.

Guides and posts for this project

Related calculators

Sources

  1. Quikrete Concrete Mix No. 1101 data sheet (bag yields)
  2. Quikrete: how to build a concrete patio (5 in of gravel tamped to 4 in)
  3. Engineering ToolBox: densities of dirt, sand and gravel
  4. Engineering ToolBox: US rebar sizes and weights
  5. Engineering ToolBox: concrete properties

See how we calculate.