Anything that touches the soil, or sits in it, needs lumber rated for ground contact, which the tag calls UC4A. That covers fence and deck posts, and in practice the ledger and most deck framing too. Above ground lumber (UC3B) is fine for deck boards, railings, fence pickets and fence rails, as long as they stay at least 6 inches up, dry out between rains and don’t collect leaves or dirt. Break any of those conditions and the industry’s own standard moves the part up to UC4A.
That standard is AWPA U1. It comes from the American Wood Protection Association, and the 2025 edition’s excerpt is free to read. We read it on October 20, 2026, alongside the American Wood Council’s DCA 6 deck guide (the edition based on the 2015 code). DCA 6 is blunt about the floor: “All lumber in contact with the ground shall be approved preservative treated wood suitable for ground contact.” No wiggle room there. Its Table 1 footnote spells out the codes, above ground UC3B and ground contact UC4A.
The letters on the tag
UC means use category. The number and letter tell you how much rot risk the wood was treated for:
| Tag says | AWPA’s name for it | Typical deck and fence parts |
|---|---|---|
| UC3A | Above ground, coated | Painted fence pickets and rails |
| UC3B | Above ground, exposed | Deck boards, railings, unpainted pickets and rails |
| UC4A | Ground contact, general use | Fence and deck posts, landscape ties, framing that can’t dry |
| UC4B | Ground contact, heavy duty | Building posts and poles, farm posts, permanent wood foundations |
Those rows come from Table 3-1 and the category definitions in U1. U1 puts sawn fence posts and deck support posts in UC4A, not UC4B. UC4B is for posts that hold up a building (a pole barn, say), farm posts, wood in salt water splash zones, and ground contact in what U1 calls “severe environments” or “climates with a high potential for deterioration.” Our call: a gate post takes a beating and is a pain to replace, so if your yard stocks UC4B 4x4s or 6x6s, that’s where we’d spend the extra.
Six things that push above ground lumber up to UC4A
AWPA tightened this part of the standard in February 2016, according to YellaWood’s summary, and Note 1 in the current U1 is why “above ground” doesn’t simply mean “not buried.” A deck or fence part that’s above ground still needs UC4A when:
- Soil, plants, leaf litter or other debris can be expected to build up against it and stay there.
- The structure, nearby buildings or plants will block air from moving under the deck and between the boards.
- It sits less than 6 inches above the final grade (after landscaping) on treated wood or concrete with no moisture barrier between.
- It touches untreated wood that isn’t naturally durable, or older wood with any sign of decay.
- It gets wet often, for example from a fixed sprinkler you can’t aim away.
- It’s in a tropical climate.
U1’s definition of UC4A adds one more case on top: above ground parts that are “difficult to maintain, repair or replace” and critical to the whole structure’s safety. Footnote 1 to its Table 2-1 applies that to joists and beams by name. The Southern Forest Products Association’s buyer’s guide adds hot tubs and air conditioner runoff to the list of places to “always specify and verify” ground contact. If your deck needs a permit, ask your building department which edition of these rules it goes by.
One deck, three ways
Take the 16 by 12 foot deck our deck calculator uses as its example: 29 deck boards, 13 joists (2x10s, 12 feet long) and a ledger bolted to the house. Our deck footings guide puts a beam at the outer edge on three posts. The same shopping list splits differently depending on where the deck sits. U1 doesn’t mention ledgers. YellaWood’s summary names joists, beams and ledger boards as examples of hard-to-replace parts, and a ledger bolted to the house fits that better than anything else on the deck.
| Part | Deck 3 ft up, open underneath | Deck under 6 in from grade, on concrete blocks with no moisture barrier | Deck beside a hot tub or fixed sprinkler |
|---|---|---|---|
| 3 posts | UC4A | UC4A | UC4A |
| Ledger | UC4A (our call: hard to replace) | UC4A | UC4A |
| Beam | UC3B allowed, UC4A advised | UC4A | UC4A |
| 13 joists | UC3B allowed, UC4A advised | UC4A (condition 3, likely 2) | UC4A where wetted (condition 5) |
| 29 deck boards | UC3B | UC4A (condition 3, likely 2) | UC4A where wetted |
| Railing | UC3B | UC3B | UC3B unless the sprinkler hits it |
The middle column is the expensive surprise. Framing that low, sitting on bare concrete, meets condition 3 outright, and with so little room underneath, we’d expect condition 2 (air flow) to apply as well. So even the boards should be ground contact. Viance, a preservative maker, quotes AWPA on its end tag guide: “some lumber 2 inches or less in thickness may be treated only for above-ground use.” So check that UC4A decking exists in the size you want before you design a deck that low. If it doesn’t, raise the framing and leave room for air underneath, or pick a different board.
For the 3 foot deck, U1 leaves the joists and beam to judgement. ProWood, a lumber treater, argues in a sponsored 2025 Journal of Light Construction piece that joists on a deck “built just a few steps above ground level” are hard to replace, and says to use ground contact whenever you’re not sure the wood will stay dry. We agree. Replacing one joist means pulling up every board screwed to it. Buy UC4A for all the framing, and save the above ground lumber for what you can see and reach.
The fence version is simpler
The fence calculator’s worked example, 100 feet of 6 foot privacy fence with one gate, comes to 14 posts, 36 rails and 210 pickets. The posts are easy. All 14 go in UC4A (U1 Table 3-1, “General, Fence, Deck Support”). The rails and pickets can be UC3B if you leave them bare, or UC3A if you’ll paint them. If your design has a bottom board that runs along the dirt, that board is in ground contact. Buy it in UC4A even though the pickets above it aren’t. Our fence post depth guide covers how deep those 14 posts go, and the bags of concrete per fence post chart gives the count for each hole.
How much more preservative ground contact gets
The tag also prints a retention: pounds of preservative per cubic foot of wood, written pcf. AWPA sets a minimum for each category and each chemical. These are the figures two trade magazines printed. The “times” columns are our math against the UC3B number.
| Preservative | UC3B | UC4A | UC4B | UC4A vs UC3B | UC4B vs UC3B |
|---|---|---|---|---|---|
| MCA (micronized copper azole) | 0.06 | 0.15 | 0.23 | 2.5x | 3.8x |
| CA-C (copper azole) | 0.06 | 0.15 | 0.31 | 2.5x | 5.2x |
| ACQ | 0.15 | 0.40 | 0.60 | 2.7x | 4x |
MCA figures: ProWood in the Journal of Light Construction, May 2025. CA-C and ACQ figures: Fine Homebuilding, first published in 2015 and updated in October 2020. So with MCA or CA-C, a ground contact board carries about two and a half times the preservative of the above ground board next to it. Only compare within one chemical. ACQ at 0.40 and MCA at 0.15 both qualify as UC4A; each chemical just has its own minimum. Some above ground boards skip copper entirely. The SFPA guide says UC3B lumber is often treated with carbon-based preservatives, and Viance’s tag example shows its EL2 (Ecolife) at 0.019 pcf, labeled UC3B.
Reading the end tag
Viance’s guide lists what a real tag carries: a reference to AWPA U1, the use category, a plain statement such as “ABOVE GROUND USE” or “GROUND CONTACT USE,” the preservative and its retention, the inspection agency’s mark, and the treater and plant. It also passes on AWPA’s warning that if “AWPA U1” and the use category are missing, “the wood probably does not meet AWPA Standards.” Check the tag at the store, before the board leaves the rack.
One more DCA 6 rule matters once you start cutting. It says “All cuts shall be field treated with an approved preservative (such as copper naphthenate),” and it names the cut ends and notches of posts separately. Every end you saw gets a brushed-on coat. Even the hidden ones.